BEGIN:VCALENDAR
VERSION:2.0
BEGIN:VEVENT
DTSTAMP:20261004T035754Z
UID:d526fb64-9908-433a-9167-add86908505d
SUMMARY:[SEI] Sliding into the Future: Accelerated Replacement of the I-376 Commercial Street Bridge | 1 PDH
DESCRIPTION:The I-376 Commercial Street Bridge in Pittsburgh\, PA\, carries more than 100\,000 vehicles daily. To avoid years of traffic impacts from staged construction\, PennDOT selected Accelerated Bridge Construction (ABC) for the replacement. A new Arched Steel Delta Frame bridge weighing over 10\,000 tons was built adjacent to the existing structure on temporary foundations. During a 17-day interstate closure in July 2026\, the existing bridge was removed using conventional and explosive demolition\, and the new bridge was slid 102 feet into place\, making it one of the heaviest bridge slides ever executed.
DTSTART:20261112T170000Z
DTEND:20261112T180000Z
URL:https://teams.microsoft.com/l/meetup-join/19%3ameeting_YjRiNmM5ZTMtZDY3NC00M2QzLWFkYmMtMjZkYjMxZjFjNjY3%40thread.v2/0?context=%7b%22Tid%22%3a%224e1ee3db-4df6-4142-b7b9-bec15f171ca4%22%2c%22Oid%22%3a%224fc65074-4e77-4f7c-9c21-3c2fdf659c21%22%7d
END:VEVENT
END:VCALENDAR
