You don't want to miss this.
[[trackingImage]]

Mar 28

Cross Charlotte Trail Brandywine to Tyvola Segment (B2T) Tour

Please join WTS Charlotte on the afternoon of Thursday, March 28, 2024 for a walking tour of the Cross Charlotte Trail Brandywine Road to Tyvola Road segment. The guides for our walking tour will be Joe Frey and Tom Russell from the City of Charlotte's Urban Infrastructure Group.

At the end of the tour, please join us at ROCKSALT for a happy hour social around 4:30pm.

This is a FREE event open to members and non-members. Please register to secure your spot on the tour. AICP credits will be provided. Please RSVP for the Social so we know how many attendees to expect for our reservation.

*Please note that the Walking Tour has reached capacity.

Members and Friends are still welcome to RSVP to join us at the Happy Hour Social after the tour.*

Free

When

Thursday, March 28, 2024

Walking Tour: 3:00 PM to 4:30 PM

Happy Hour: 4:30 PM to 6:00 PM


Where

Meet at the Brandywine Plaza at 3:00pm. 

3350 Westfield Rd

Charlotte, NC 28209

Click for Driving Directions


On-street parking is available at the Brandywine Plaza or parking is also available in the back lot of Park Road Shopping Center near ROCKSALT with a quick walk across the Brandywine bridge to the Plaza.


Happy Hour Social

ROCKSALT

512 Brandywine Rd Ste 500

Charlotte, NC 28209

Click for Driving Directions


Contact

Katelyn Dixon

WTS Charlotte Metro

704-342-8470

katelyn.dixon@wsp.com

Brandywine to Tyvola Segment (B2T)


Completed in June 2023, the Cross Charlotte Trail Brandywine Road to Tyvola Road segment (known to City staff as “B2T”) is among the most complex, challenging, and innovative projects the City of Charlotte has ever undertaken. Due to proximity and density of adjacent development, the 1.54 mile long segment runs closely alongside and crisscrosses a narrow, winding section of Little Sugar Creek with surprisingly steep banks, passing under Brandywine Road, Woodlawn Road, and Park Road along the way. Almost the entire length is in the floodplain. The design required 25 retaining walls of various types, four bridges, and three elevated boardwalks, one which rises 18 feet in the air while arcing around a bend in the creek for over 600 linear feet. There are several unique and innovative design features to see as well as two public art installations and beautiful view sheds of the creek that previously were not accessible.

Greenway Walking Tour Guide - Joe Frey

Joe is a civil engineer with 28 years of experience on a wide variety of infrastructure and environmental projects throughout the southeastern U.S. For the past 20 years Joe has been with the City of Charlotte’s Urban Infrastructure Group where as a senior project manager he specializes in planning and implementation of projects focused on increasing transportation choices by improving connectivity and safety for pedestrians and cyclists. He has been working on the Cross Charlotte Trail since 2014. Joe graduated cum laude with a BSCE from the University of Buffalo in 1995.


Greenway Walking Tour Guide - Tom Russell

Tom is the Urban Infrastructure Program Manager with the City of Charlotte. Tom is a seasoned program manager responsible for managing very diverse high profile complex programs that include the Cross Charlotte Trail, Northeast Corridor Infrastructure, and Applied Innovation Corridor. These programs include very challenging projects for the City of Charlotte budgeted up to $259 million. Tom enjoys sharing his 28 years of Engineering experience to coach his team of project and senior project managers to accelerate the advancement of city projects through all the obstacles, challenges, and issues. Tom has been successful in leading these projects to completion by developing positive relationships with staff, customers, the public, and outside agencies for the City of Charlotte. Tom has worked on very notable projects that included Charlottes First Roundabout, Charlotte’s first streetcar tracks, Charlotte Liberty Walk, Charlotte’s First Reverse Angle Parking, Charlotte’s First Greenroads Certified Project, and numerous projects that include transportation road widenings, intersection, business corridor, safety, uptown sidewalk, transit, and greenway projects. Prior to working 25 years at the City of Charlotte, Tom spent 3 years working for Zapata Engineering and HDR Engineering as a consultant. Tom is the proud Father of his two daughters Emma 14 and Abby Russell 12.  

APA Credits

Planners attending this program can earn 1.5 AICP Certification Maintenance (CM) credits. More information about ACIP's CM program can be found at www.planning.org/cm